We are pleased to share some encouraging news regarding the existing Vistas well, along with a comprehensive update from the Vistas Well Committee on the new well project.
Existing Vistas Well – Repair Update
Following its inspection, Empire Pump confirmed that the underground pump and shaft are in good condition and do not require replacement. This is a significant positive development that helps keep repairs on schedule.
The replacement motor has arrived in the Phoenix area and is being prepared for installation tomorrow, Wednesday, October 28.
Repairs to the electrical control panel will include replacement components and rewiring. As an added precaution, we are also installing a motor protection device (motor saver) designed to detect electrical abnormalities and shut down the equipment before significant damage occurs.
If repairs and testing proceed as planned, we anticipate restoring water service from the existing well by Saturday, October 31. This remains a target date, subject to successful completion of the work.
Based on this timeline and our current water reserves, we expect to maintain normal golf course operations and conditions without interruption. Should repairs take longer than anticipated, we can supplement our water supply with City of Peoria water if needed. At this time, we do not anticipate any impact on golf course operations or conditions.
|